Warm Springs Road to Southern Beltway

Warm Springs Road to Southern Beltway

4LEAF provided additional field inspection support and quantity verification services for this $41 million project that included a 338-foot, three-span UPRR bridge at Decatur Boulevard, a 116-foot two-span UPRR bridge at Warm Springs Road, a temporary railway detour...
I-215 Airport Connector Phase 1

I-215 Airport Connector Phase 1

4LEAF provided construction management and inspection services on the $34 million Southern I-215 Bruce Woodbury Beltway and the Interstate-215 /Airport Connector Interchange in Las Vegas, NV. Phase 1 of this project consisted of freeway and incidental improvements to...
Bonanza Trail Phase II

Bonanza Trail Phase II

This $3.3 million project included the construction of a trail, lighting, striping, signage, one pedestrian bridge, and one pedestrian undercrossing and associated appurtances. As a subconsultant, 4LEAF provided a senior bridge inspector during the erection of the...
Cactus Avenue – UPRR Grade Separation

Cactus Avenue – UPRR Grade Separation

4LEAF is providing subconsultant field inspection services for this $8.6 million project that includes full improvements along Cactus Avenue from Rainbow Boulevard east to Verona Wood Street.  Project components include bridge structure improvements; construction of...
I-15 Design Build Project

I-15 Design Build Project

4LEAF provided senior roadway and electrical inspectors for staff augmentation on this $245 million Nevada Department of Transportation design-build project.The I-15 Design-Build project is intended to increase traffic capacity on this very busy stretch of freeway...
Desert Inn Deck

Desert Inn Deck

4LEAF provided construction management services and a Senior Project Representative for this $3.8 million Clark County Public Works project in Las Vagas, NV.  The work performed included constructing approximately 110 feet of bridge deck over the Desert Inn Road...
Harmon Avenue Relocation

Harmon Avenue Relocation

4LEAF provided construction management and inspection services on this $3.1 million project. Improvements included the installation of a 36-inch diameter water line, 10-inch diameter water line, and individual water services to large hotels and restaurants. The...