City of Cupertino Public Works Mitigation Projects

City of Cupertino Public Works Mitigation Projects

4LEAF performed Resident Engineer (RE) and inspection services for the City of Cupertino on numerous Public Works improvement projects being performed in the City associated with the construction of the Apple Campus 2 Project.  Improvements included installing new...
City of Lincoln Lincoln Boulevard Improvement Project

City of Lincoln Lincoln Boulevard Improvement Project

Lincoln Boulevard, formerly State Highway 65, is a two-lane arterial through the main business district of the City. This is a federal and Caltrans funded project along relinquished Highway 65.  Many small businesses are along the project area and have frequent...
City of Pacifica Balboa Way Repairs Project

City of Pacifica Balboa Way Repairs Project

4LEAF and our sub-consultant, Construction Testing Services, provided Construction Management, Inspection, and Materials Testing and Special Inspection services for the City of Pacifica’s $2.2M Balboa Way Street Repairs project.  The project included restoration...
I-215 Airport Connector Phase 1

I-215 Airport Connector Phase 1

4LEAF provided construction management and inspection services on the $34 million Southern I-215 Bruce Woodbury Beltway and the Interstate-215 /Airport Connector Interchange in Las Vegas, NV. Phase 1 of this project consisted of freeway and incidental improvements to...
Auburn Boulevard Complete Streets Project

Auburn Boulevard Complete Streets Project

4LEAF provided all construction management and inspection services for this City of Citrus Heights project that resulted in the transformation of an aging, disjointed, and hazardous pedestrian environment to a well-connected, vibrant, mixed-use, transit-oriented and...
Tower Bridge Gateway Project

Tower Bridge Gateway Project

4LEAF provided full-service construction management and on-site construction inspection services for this dynamic $5 million project.  This project reconfigured the eastern end of the Tower Bridge Gateway from a former freeway to a boulevard that serves the Bridge...
Bonanza Trail Phase II

Bonanza Trail Phase II

This $3.3 million project included the construction of a trail, lighting, striping, signage, one pedestrian bridge, and one pedestrian undercrossing and associated appurtances. As a subconsultant, 4LEAF provided a senior bridge inspector during the erection of the...
West Capitol Avenue Streetscape Project

West Capitol Avenue Streetscape Project

4LEAF provided full-service construction management and on-site construction inspection services for this dynamic $7 million roadway project, ultimately reducing the existing number of lanes to lay the foundation for the streetcar system. The project included major...
Cactus Avenue – UPRR Grade Separation

Cactus Avenue – UPRR Grade Separation

4LEAF is providing subconsultant field inspection services for this $8.6 million project that includes full improvements along Cactus Avenue from Rainbow Boulevard east to Verona Wood Street.  Project components include bridge structure improvements; construction of...
Citrus Heights Asphalt Overlay Project

Citrus Heights Asphalt Overlay Project

4LEAF provided on-site construction inspection services and material inspection services for the asphalt overlay project. The project involved 74 ADA ramps and included placing asphalt concrete overlay on various streets including placement of leveling course, minor...
I-15 Design Build Project

I-15 Design Build Project

4LEAF provided senior roadway and electrical inspectors for staff augmentation on this $245 million Nevada Department of Transportation design-build project.The I-15 Design-Build project is intended to increase traffic capacity on this very busy stretch of freeway...
Desert Inn Deck

Desert Inn Deck

4LEAF provided construction management services and a Senior Project Representative for this $3.8 million Clark County Public Works project in Las Vagas, NV.  The work performed included constructing approximately 110 feet of bridge deck over the Desert Inn Road...
Harmon Avenue Relocation

Harmon Avenue Relocation

4LEAF provided construction management and inspection services on this $3.1 million project. Improvements included the installation of a 36-inch diameter water line, 10-inch diameter water line, and individual water services to large hotels and restaurants. The...
Mount Diablo State Park Road Improvements

Mount Diablo State Park Road Improvements

4LEAF provided construction inspection services to the South Gate Road System Improvements project in Mount Diablo State Park. South Gate Road is one of two entrance points for the approximately 20,000-acre park. As part of the long-term Mt. Diablo Road and Trail...