by Gene Barry | Sep 22, 2017
The SR 89 Mousehole Pedestrian and Bicycle Improvement Project was a high profile and long awaited project that constructed a multi-use path and pedestrian tunnel along the east side of State Route 89 and Interstate Highway 80. The tunnel was a UPRR underpass that was...
by Gene Barry | Oct 19, 2015
4LEAF provided project and construction management services on the $3.5 Million historic renovation of the Governor’s Mansion in Sacramento, as Governor Jerry Brown and his wife make plans to move into the residence at the end of 2015. The mansion, purchased by the...
by Gene Barry | Feb 12, 2015
4LEAF provided construction inspection and observation services and our sub-consultant team performed testing and Geotechnical Engineering-of-Record services for the construction of the new 10th University of California, at Merced. This $350 million project was...
by Gene Barry | Feb 12, 2015
4LEAF is providing Inspector of Record Services for the UC Davis South Valley Animal Health Laboratory (SVAHL). SVAHL is a new laboratory and office building of approximately 53,000 gross sq. ft. The building will provide space for a new veterinary diagnostic testing...
by Gene Barry | Feb 12, 2015
4LEAF performed Inspector of Record services on behalf of Calaveras County and Kitchell CEM for the $80 million New Adult Detention Facility and Sheriffs Administration Building. This project included construction of three new buildings totaling approximately 130,000...
by Gene Barry | Feb 12, 2015
4LEAF is providing full construction management, construction administration, and inspection services for this $18M highly-anticipated project that transforms the State Historic Park into a vibrant Urban Park in the heart of downtown Los Angeles – fully...
by Gene Barry | Feb 12, 2015
4LEAF provided inspection services for Phase 3 of the rehabilitation of the Immigration Station Hospital at Angel Island State Park. 4LEAF also provided the same services for Phases 1 and 2 of the rehabilitation project. The restoration and stabilization of this...
by Gene Barry | Feb 12, 2015
4LEAF provided construction management and inspection services for this high profile project that transformed a beach trailer park into the new El Moro Campground. The 35-acre project site is located within the 2,791 acre Crystal Cove State Park and on one of the last...
by jhawkins | Feb 12, 2015
4LEAF provided building inspection services to the Public Works Department to act as owner’s representative for the construction of these two fire station projects. Fire Station #17 is a three bay 12,800 sq ft project. Fire Station #18 is a two bay 8,600 sq ft...
by jhawkins | Feb 12, 2015
4LEAF provided quality assurance inspection services to the City of Lafayette during the construction of the new Lafayette Library and Learning Center. 4LEAF acted as the Owner’s representative to ensure the project was completed in accordance with the project’s plans...
by Gene Barry | Feb 9, 2015
4LEAF is providing construction inspection services for the California Department of Corrections and Rehabilitation (CDCR) Mule Creek Infill Complex (MCIC) project. The MCIC Project is located adjacent to the existing Mule Creek State Prison in Ione, CA. Situated on...
by Gene Barry | Feb 9, 2015
4LEAF provided inspection services on behalf of the City of Palo Alto for the $1.3 billion VMware Campus expansion project. Dubbed the “campus in the forest”, VMware’s headquarters encompasses more than 105 acres with roughly 1,500 trees in the Stanford Research Park....
by Gene Barry | Feb 9, 2015
Since 2010, 4LEAF has provided broad-based building, fire, and public works consultant services for the City of Cupertino. 4LEAF has performed numerous plan reviews for residential, commercial, and industrial projects. 4LEAF is currently performing plan review...
by jhawkins | Feb 9, 2015
4LEAF is providing Inspector of Record services for this project that consists of approximately 140,000 gross-sq-ft, $145 million computer facility and associated infrastructure with accommodations for approximately 300 staff. Designed to take advantage of the cool...
by jhawkins | Feb 9, 2015
Campus project featuring one 5-story and two 6-story steel frame structures and underground parking. This project also includes extensive onsite and offsite improvements. 471,339 sq ft of office and retail space and 689,494 sq ft of parking.
by jhawkins | Jan 23, 2015
4LEAF provided construction management and inspection services for this high profile project that transformed Yosemite Slough, a previously neglected part of the City’s waterfront located in Candlestick Point State Recreation Area, into a restored wildlife...
by jhawkins | Jan 23, 2015
4LEAF is providing construction management services for the Water Emergency Transit Authority (WETA) Central Bay Operations and Maintenance Facility. The project will provide a central San Francisco Bay base for WETA’s ferry fleet. The facility will include an...
by jhawkins | Jan 23, 2015
The San Francisco Marina West Harbor underwent major facility renovations and site improvements to accommodate the 2013 America’s Cup in San Francisco. The San Francisco Marina is home to the St. Francis Yacht Club and the Golden Gate Yacht club (winner of the 2010...
by jhawkins | Jan 23, 2015
4LEAF provided inspection services for the Cuyamaca Rancho State Park Water System Rehabilitation Project. Cuyamaca Rancho State Park’s aging water storage and distribution system had exceeded its design life and was experiencing many leaks requiring excessive...
by jhawkins | Jan 23, 2015
4LEAF worked on two separate contracts totaling $1.2 million for the reconstruction of a new water treatment plant building. This new plant included the removal of the existing membrane and replacing with a new membrane system that has three separate treatment phases...
by jhawkins | Jan 23, 2015
4LEAF provided construction inspection services on this project that replaced three miles of 16-inch diameter high-pressure steel lines under the major collector streets of West Sacramento. The new line route was within two major roadways in the city – West Capitol...
by jhawkins | Jan 23, 2015
4LEAF staff performed public works inspection of storm drain replacement, paving fabric installation, asphalt concrete overlay/inlay, asphalt concrete reconstruction, milling, grinding, AC dike installation and striping for the City’s annual Capital Improvements...
by jhawkins | Jan 23, 2015
4LEAF provided construction management and inspection services to the City of Burlingame in support of their multi-phased Downtown Burlingame Avenue Area Improvement and Rehabilitation projects. 4LEAF was initially selected by the City to provide these services for...
by jhawkins | Jan 23, 2015
4LEAF staff was responsible for performing Construction Management and Construction Inspection Services on this 8.6 acre $350 million project in Palo Alto at the former campus of the Sun Microsystems Corporation at 901 San Antonio Rd. This project consisted of two...
by jhawkins | Jan 22, 2015
Since 2002, 4LEAF has provided the University of California at Berkeley (UC Berkeley) with Construction Management and Engineering Support services for the on-going environmental remediation project at the Richmond Field Station (RFS) in Richmond, CA. The RFS is...
by jhawkins | Jan 22, 2015
4LEAF provided environmental support services to Tutor-Saliba during the construction of new Caldecott Tunnel Portal Number 2 project in Contra Costa and Alameda Counties, CA. Services provided include collecting waste characterization samples of tunnel spoils and...
by jhawkins | Jan 22, 2015
4LEAF provided the University of California at Berkeley (UC Berkeley) Capital Projects’ Department with Storm Water Pollution Prevention Plan (SWPPP) services for the multi-phased Clark Kerr Campus Renewal Project on the UC Berkeley campus in Berkeley, CA. The Clark...
by jhawkins | Jan 1, 2015
The Green Line to River District Project was the first phase of a 12.8-mile extension of RT’s light rail service from downtown Sacramento through Natomas to the Sacramento International Airport. The $44 million Design/Build project included construction of...
by jhawkins | Jan 1, 2015
4LEAF provided full-service construction management and construction inspection services for this critical extension of Sacramento’s light rail transit (LRT) system from 7th and K Streets to Amtrak’s intercity rail passenger station. The $27 million...
by jhawkins | Jan 1, 2015
4LEAF provided construction management and inspection services for the $1.7 million construction of an approximately 1,500 sq-ft- transit center depot building and a landscaped pedestrian plaza. This grant-funded project was a partnership between the City of Cotati,...
by Gene Barry | Jan 1, 2015
4LEAF provided all construction management and inspection services for this City of Citrus Heights project that resulted in the transformation of an aging, disjointed, and hazardous pedestrian environment to a well-connected, vibrant, mixed-use, transit-oriented and...
by Gene Barry | Jan 1, 2015
4LEAF provided part-time construction management and full-time inspection services to the City of Walnut Creek for the Phase 3 Geary Road Improvements Project. Geary Road connects Pleasant Hill Road with Treat Boulevard and serves as the only arterial connection...
by jhawkins | Jan 1, 2015
4LEAF provided full-service construction management and on-site construction inspection services for this dynamic $5 million project. This project reconfigured the eastern end of the Tower Bridge Gateway from a former freeway to a boulevard that serves the Bridge...
by jhawkins | Jan 1, 2015
4LEAF provided full-service construction management and on-site construction inspection services for this dynamic $7 million roadway project, ultimately reducing the existing number of lanes to lay the foundation for the streetcar system. The project included major...
by jhawkins | Jan 1, 2015
4LEAF provided on-site construction inspection services and material inspection services for the asphalt overlay project. The project involved 74 ADA ramps and included placing asphalt concrete overlay on various streets including placement of leveling course, minor...
by jhawkins | Jan 1, 2015
4LEAF provided construction inspection services to the South Gate Road System Improvements project in Mount Diablo State Park. South Gate Road is one of two entrance points for the approximately 20,000-acre park. As part of the long-term Mt. Diablo Road and Trail...
by jhawkins | Dec 23, 2014
The Malibu Lagoon Project was a high profile, challenging coastal restoration and earthwork project. The project was closely scrutinized by several government agencies including Santa Monica Bay Restoration, the Coastal Commission, the National Park Service, and...